Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Djokovic tops ATP rankings, Sabalenka No. 2

    January 31, 2023

    Pakistan mosque suicide bombing death toll rises to 88

    January 31, 2023

    Rory McIlroy wins Hero Dubai Desert Classic for first Rolex Series title

    January 31, 2023
    Facebook Twitter Instagram
    Angola ReportAngola Report
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Angola ReportAngola Report
    Home » With a $30 billion power grid upgrade, India to triple clean-power capacity by 2030
    Business

    With a $30 billion power grid upgrade, India to triple clean-power capacity by 2030

    December 9, 2022
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    In order to achieve its goal of nearly tripling the country’s clean-power capacity by 2030, the Indian government, under Prime Minister Narendra Modi, has unveiled a Rs 2.44 lakh crore ($29.6 billion) plan to build transmission lines for renewable generation in the country. According to a statement from the Ministry of Power, through the project, solar plants in the sun-drenched deserts of Rajasthan and Gujarat, as well as wind farms in Tamil Nadu, will be connected to the national power grid.

    By the end of the decade, India’s inter-regional transmission capacity will increase from 112 gigawatts to 150 gigawatts. The lack of transmission lines in India has hampered the growth of renewable electricity in the country. It is essential for the nation to address this shortfall as it embarks on its journey towards net zero by 2070. This is so that clean energy can be carried to urban and industrial hubs that are often remote from sources of energy.

    With a total generation capacity of 173 gigawatts, India generates its electricity from non-fossil fuel sources, which includes building transformers and high-voltage lines to transport power over long distances, as well as laying submarine cables for transferring electricity from offshore wind projects. Despite the fact that the power networks sector welcomed the revised plan, it did sound a note of caution with regards to the awarding of contracts. The private transmission companies have been lobbying New Delhi to allocate all projects through competitive bids rather than allowing the state-run Power Grid Corp. of India Ltd. to get some of the projects without any competition.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Philips cuts 13 percent of jobs in a safety and profitability drive

    January 30, 2023

    German-Australian hydrogen supply chain investment of $90 million

    January 28, 2023

    Global growth will slow to 1.9 percent in 2023, warn UN economists

    January 26, 2023

    Modi-Sisi sign MoUs to boost Indian-Egyptian trade to $12 billion

    January 26, 2023
    Latest News

    Djokovic tops ATP rankings, Sabalenka No. 2

    January 31, 2023

    Pakistan mosque suicide bombing death toll rises to 88

    January 31, 2023

    Rory McIlroy wins Hero Dubai Desert Classic for first Rolex Series title

    January 31, 2023

    Somalia faces famine as US urges more donation

    January 30, 2023

    Suicide bomber kills 20 and injures 96 at mosque in Pakistan

    January 30, 2023

    Philips cuts 13 percent of jobs in a safety and profitability drive

    January 30, 2023

    Ex-general Petr Pavel beats populist rival in Czech presidential election

    January 30, 2023

    Australian authorities are searching for a missing radioactive capsule

    January 28, 2023
    © 2023 Angola Report | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.